San Elijo Hills homes and real estate. Before you start thinking, ‘hey, I am going to get the builder to fix it’ understand the terminology and definitions to determine exactly what may be covered.
Be advised that each San Elijo Hills home builders warranty varies and as with all contracts, the devil is in the details or in this case the ‘fine print.’
CIVIL CODE SECTION 895
895. (a) "Structure" means any residential dwelling, other building, or improvement located upon a lot or within a common area. (b) "Designed moisture barrier" means an installed moisture barrier specified in the plans and specifications, contract documents, or manufacturer's recommendations. (c) "Actual moisture barrier" means any component or material, actually installed, that serves to any degree as a barrier against moisture, whether or not intended as such. (d) "Unintended water" means water that passes beyond, around, or through a component or the material that is designed to prevent that passage. (e) "Close of escrow" means the date of the close of escrow between the builder and the original homeowner. With respect to claims by an association, as defined in subdivision (a) of Section 1351, "close of escrow" means the date of substantial completion, as defined in Section 337.15 of the Code of Civil Procedure, or the date the builder relinquishes control over the association's ability to decide whether to initiate a claim under this title, whichever is later. (f) "Claimant" or "homeowner" includes the individual owners of single-family homes, individual unit owners of attached dwellings and, in the case of a common interest development, any association as defined in subdivision (a) of Section 1351
To learn more about the California Civil Chaco Code, we suggest that you Google the following:
California Code - Title 7: REQUIREMENTS FOR ACTIONS FOR CONSTRUCTION DEFECTS [895. - 945.5.]
http://www.leginfo.ca.gov/cgi-bin/displaycode?section=civ&group=00001-01000&file=941-945.5